The optics supply base is getting narrower at exactly the moment demand is getting broader. Coating capacity is being absorbed by datacom, automotive sensing, semiconductor equipment and defence programmes, and the suppliers that remain are consolidating around fewer customers, fewer platforms and longer planning horizons.

For a buyer, the risk is not that a supplier disappears. It is that a supplier becomes allocated — capacity committed a year ahead, new designs accepted only when they fit an existing platform, small orders quietly de-prioritised.
Why second sourcing is harder than it used to be
Qualifying a coating supplier takes a first-article cycle: substrate, polish, coating, measurement, environmental test, and then a production lot to prove repeatability. That is months, not weeks, and it consumes engineering time on both sides. Most companies only do it under pressure, which is the worst possible time.
Consolidation makes it worse in a specific way. When a supplier reduces its platform count, a design that does not match a platform has to be built as a one-off, which is expensive and slow — so the second source is often not a like-for-like replacement. It is a redesign with equivalent performance, which means the buyer's own drawing has to be flexible enough to accept it.
A workable dual-source playbook
Keep the drawing functional, not proprietary. Specify the optical outcome — transmission, blocking, LIDT, wavefront, environmental class — and let substrate and coating design stay open where they can. A drawing that names a specific coating stack has exactly one source by construction.
Qualify on a real part, not a witness. Coat a production substrate at production thickness, then measure. Witness slides hide stress and uniformity problems.
Demand lot-to-lot data. Three lots, same measurement, same conditions. A supplier who cannot produce this is telling you something.
Test the awkward conditions early. Damp heat, thermal cycling, abrasion, adhesion. These fail more programmes than optical performance does.
Agree a capacity floor in writing. Not a forecast — a minimum allocation per quarter, with a defined response if it cannot be met.
Re-qualify on a schedule. Once a year, run a small lot through the second source even when nothing is wrong. The point is to keep the qualification alive, not to save money.
The China-side angle, stated plainly
For European and North American buyers, the Chinese coating base is less consolidated than the Western one, and capacity is available at sizes that larger houses will not quote — small lots, mixed substrate batches, short runs of a custom wavelength. The trade is that diligence has to be done properly: ask for the measurement equipment, the calibration date, the LIDT test setup, and the traceability of the substrate batch. A supplier who answers those questions precisely is usually a supplier worth keeping.
What good looks like
A second source that returns a first article matching your curve within tolerance, with a lot-to-lot report, an environmental test summary, and a named engineer who answers technical questions directly. That combination is worth more than a lower unit price, because it is the difference between a supply chain and a single point of failure.